Energy cable installation - Cable installation for all voltage levels

Kummler+Matter EVT provides all building and installation services for energy supply networks. In accordance with the relevant safety standards, the special teams lay cables of all kinds and ensure fault-free connections. Quality that pays off!

 

Cable installation is the cornerstone of today's energy supply: In order for everything to flow, the cables must be laid in pipes accurately and protected against external influences. Kummler+Matter EVT is a good choice for any type of cable work thanks to its comprehensive vehicle, machine and material inventory. The employees in specialist teams of Kummler+Matter EVT are masters of their trades - from A to Z. With experienced assembly groups, every type of cable can be laid, at all voltage levels. In normal pipe systems, in cable routes, tunnels and underground caverns. And this can be done both manually and mechanically. The specialists are supported by a large fleet of special vehicles, such as cable pulling machines, cable trolleys, crane vehicles and reels.

Demand-oriented services, from individual packages to complete solutions - individual and flexible

  • Planning
  • Engineering
  • Execution
  • Commissioning
  • Upkeep

Planning

Kummler+Matter EVT can advise you on project evaluation and preliminary costing, prepare the work programme and schedule and manage the construction activities and the overall project.

Engineering

During this step of the process acquisition takes place, a SAR (Site Acquisition Report) is prepared, permits are obtained, and owner negotiations and materials are evaluated.

Execution

Depending on the location, temporary building site installations and temporary/electro-technical facilities may be needed for the construction of energy grids. These turnkey installations are provided by Kummler+Matter EVT and put in place ready for use. During the execution phase, the cables are laid and pulled through, the sleeves are installed, and distribution cabins as well as final distributors are equipped and connected.

Commissioning

After the installation and assembly work, installation measurements and material tests are carried out, which are followed by a 24-hour voltage test. Only after this is the cable approved for operation.

Upkeep

In addition to preventive maintenance (search for interruptions, etc.), Kummler+Matter EVT also takes care of the dismantling of systems as well as repair and restoration work. Professional/environmentally friendly disposal is of course a key factor.

Technical highlights

  • Works management and master builder work
  • Cable pulling
  • Transformer stations
  • Temporary building site components - Medium and low voltage
  • Trenchless piping
  • Machinery park

Your advantages

  • Smooth overall planning and implementation of public lighting projects - from simple projects to comprehensive, complex undertakings.

  • Experts from all areas work hand-in-hand at Kummler+Matter EVT: electrical engineers, structural engineers, civil engineers and experienced network electricians. Laborious coordination activities can therefore be dispensed with - Kummler+Matter EVT takes care of everything for you.

  • Kummler+Matter EVT has all of the machines, equipment and vehicles needed in its own inventory - from telescopic lifting platforms to cable pulling equipment and temporary emergency power generators.